| Company Name | Closing Date | Description |
| Cavanaugh & Associates, P.A. | 11/24/2009
10:00 AM
| ARRA funded project - installation of solar-powered mixers in five (5) potable water storage tanks in Stanly County, NC. Project could include minor welding, painting, electrical, site clean up and/or tank cleaning |
| TA Loving company | 11/24/2009
10:00 AM
| ARRA-Goldsboro Water Treatment Plant Phase 1. Plans from TA Loving-Goldsboro; Goldsboro Public Utilities Office; ARCADIS G&M-Raleigh; McGraw-Hill/Dodge Plan Room-Raleigh |
| Cavanaugh & Associates, P.A. | 11/24/2009
11:00 AM
| ARRA Funded project - Re-advertisement of installation of solar-powered mixers in potable elevated water storage tanks for the City of Burlington . prpoject may include hatch modifications, tank coating touch up and minor welding |
| Cavanaugh & Associates, P.A. | 11/24/2009
2:00 PM
| ARRA Funded project - installation of solar-powered mixer in elevated potable water storage tank for the City of Graham, NC. Project may include minor welding, painting, electrical, site clean-up, tank cleaning |
| TA Loving company | 11/24/2009
2:00 PM
| ARRA-Burgaw Wastewater System Improvements - Plans available from TA Loving Co - Goldsboro; Town of Burgaw; McKim & Creed-Wilmington; AGC & FW Dodge-Raleigh, Greensboro, Charlotte, Wilmington. |
| West Consultants, PLLC | 11/24/2009
2:00 PM
| ARRA-Town of Taylorsville, NC - Sewer Collection System Rehabilitation Project, Contract A: Sewer Pipeline Rehabilitation and Contract B: Various Sewer System Repairs. Please contact our office for a copy of the Advertisement for Bid. |
| Cavanaugh & Associates, P.A. | 11/24/2009
3:00 PM
| ARRA funded project - installation of solar powered mixer in City's raw water reservoir |
| West Consultants, PLLC | 11/25/2009
2:00 PM
| ARRA-DEH 1541 Town of Rutherford College Water Meter Improvement Project--approx. 800 radio transceivers and various meters and equipment. Please contact office for a copy of the Advertisement for Bids. |
| City of Jacksonville | 11/30/2009
3:00 PM
| ARRA-FY 10-05 Water System Improvement Phase II Contract 1 includes upgrades to Main Pump Station, drilling 4 test wells and production wells which includes well houses, site work, etc. in addition to installing raw and finished water transmission mains. |
| TA Loving company | 11/30/2009
3:00 PM
| ARRA - Jacksonville Water System Improvements, Phase 2 Contract 1 - Plans available at City of Jacksonville Engineering Division and T.A. Loving Co. - Goldsboro, NC |
| Geo. Raper & Son, Inc. | 11/30/2009
4:00 PM
| ARRA solicitations for DBE, WBE & MBE subs and suppliers for labor, equipment and/or materials on the WTP improvement in the Town of Maysville. Job includes replacement of softener,relocate filters, pumps,precast concrete, and piping. |
| Cavanaugh & Associates, P.A. | 12/1/2009
10:00 AM
| ARRA Funded Project - installation of solar-powered mixer in two (2) elevated potable water storage tanks for the Town of Snow Hill, NC. project could include minor welding, painting, electrical, site clean up and/or tank cleaning |
| Cavanaugh & Associates, P.A. | 12/1/2009
2:00 PM
| ARRA Funded Project - installation of solar-powered mixer in one (1) elevated potable water storage tank for the Town of Newport, NC. project could include minor welding, painting, electrical, site clean up and/or tank cleaning |
| Laughlin-Sutton Construction Company | 12/1/2009
2:00 PM
| ARRA - Harnett Co. Contract#3 Booster Pump Sta. East Central Water Systems Improvements. Work includes 2 canned vertical turbine pump stations & all elec. wiring, fixtures, fencing, sitework, painting, asphalt, doors & hardware, masonry, roofing & louver |
| TA Loving company | 12/1/2009
2:00 PM
| ARRA - 2009 W.T.P. Improvements Town of Maysville. Plans from TA Loving-Goldsboro; AGC Offices-Fayetteville, NC & Raleigh, NC; Hobbs, Upchurch & Assoc.-Wilmington. |
| SCW Contracting Corp. | 12/2/2009
10:00 AM
| ARRA-UDBE City of Los Angeles - Bike Safe Grating Replacement Project - SCW Is Requesting Certified DBE's for: Subs- Rebar, Saw Cutting Suppliers: Grating, Construction Signs, Traffic Control, Rebar. |
| Pacific States Engineering | 12/2/2009
11:00 AM
| ARRA-MOJAVE DRAINAGE IMPROVEMENTS - PHASE 11-PSE is requesting bids from (but not limited to) Reinforced concrete pipe, sand/aggregate, sawcutting, paving, striping, structural concrete & flatwork, trucking, , fencing |
| Laughlin-Sutton Construction Company | 12/2/2009
2:00 PM
| ARRA Town of Ramseur Solar Powered Reservoir Mixing Units. Installation of 4 hypolimnetic oxygenation units at the Sandy Creek Raw Water Reservoir. Work includes WTP and solar powered equipment. |
| Laughlin-Sutton Construction Company | 12/2/2009
2:00 PM
| ARRA Town of Ramseur Raw Water By-Pass Pump Station. Includes one canned vertical turbine, one empty pump can for future use, assoc. site work, electrical, site piping, valves, concrete, and painting. |
| Thalle Construction Co., Inc | 12/2/2009
5:00 PM
| Thalle Construction Co., Inc. is soliciting quotes for for this ARRA funded project. DEH-1065. 10% DBE/MBE/WBE goal. Construction plans and specifications are available upon request. Project consists Raw Water Intakes,Pump Sta, etc. |
| Buckeye Construction | 12/3/2009
10:00 AM
| ARRA-Slater Sewer Rehab: Need subcontractors for clearing/grubbing, rock excavation, asphalt paving/overlay, concrete sidewalks/curb & gutter, and by-pass pump rental as well as suppliers of pipe, valves, stone & gravel. |
| Cavanaugh & Associates, P.A. | 12/3/2009
10:00 AM
| ARRA Funded Project - installation of solar-powered mixer in one (1) elevated potable water storage tank for the City of Graham, NC. project could include minor welding, painting, electrical, site clean up and/or tank cleaning |
| Cavanaugh & Associates, P.A. | 12/3/2009
11:00 AM
| ARRA Funded Project - installation of three (3) solar-powered mixers in raw water reservoir for the City of Graham, NC |
| CDM Federal Programs | 12/3/2009
12:00 PM
| ARRA, Crossley Farm Site, Hereford Township, PA. Down hole geophysical logging of up to twelve 300' boreholes for Base Period of Work. Optional Period up to addtl 15 boreholes. Sub shall be Onsite within 2 days of notification. Email POC for Solicitation. |
| McGuire-Pacific Constructors | 12/3/2009
1:00 PM
| ARRA Funded, Amador County, Traffic Sign Replacement/Reflective Upgrade for Safety, Bid #09-28, Due 12/3/09
Seeking: Traffic Control/Materials, Roadside Signs, Sign Posts, Lead Compliance Plan, Natural Occurring Asbestos Plan |
| Cavanaugh & Associates, P.A. | 12/3/2009
2:00 PM
| ARRA Funded Project - installation of solar-powered mixer in one (1) potable water storage tank for the Town of Franklinville, NC. project could include minor welding, painting, electrical, site clean-up and/or tank cleaning |
| McGill Associates, P.A. | 12/3/2009
2:00 PM
| ARRA Project-Raw water intake w/ two 36" intake lines, intake screens, vert turbine pump station, 30" raw water main, piping, valves, electrical and associated appurtenances @ the City of Lenoir WTP on Lake Rhodhiss. Add'l info at www.mcgillbidline.com |
| Sauer Inc. | 12/3/2009
2:00 PM
| Various Subcontractors needed to help prepare quote for ARRA D/B P116 Steam Plant Area Decentralization & Energy Conservation Measures, Naval Station Norfolk, VA. Docs available from GC. |
| Spiess Construction Co., Inc. | 12/3/2009
2:00 PM
| ARRA - Clark Co. Water Reclaimation Dist.- Upgrade at Indian Springs. Seeking subcontractor for the following: Electrical,Mechanical, Paving, Earthwork, Masonry, Metal Roofing, Jack & Boring, Painting, Fencing, Traffic Control, Drywall, Rebar & Concrete |
| CDM Federal Programs | 12/4/2009
12:00 PM
| ARRA, Crossley Farm Site, Hereford Township, PA. Water treatment, handling and supply services. Handling of IDW onsite, poet system repair, maintenance, temporary groundwater treatment system construction & maintenance.Email POC for Invitation for Bid. |
| HydroGeoLogic, Inc. | 12/4/2009
2:00 PM
| HGL, Inc. seeks environmental consulting & geophysical surveying specializing in radiological services in support of its EPA "Recovery" Santa Susana Field Laboratory Area IV Radiological Study Ventura Co, CA. ARRA requirements apply. Email inquiries only. |
| Diede Construction | 12/4/2009
4:00 PM
| ARRA Funded, Calaveras County, Dept of Public Works, Multiple Bus Shelters
Seeking: Concrete, Rebar, Site Work, Excavation, Striping |
| Caddell Construction Co., Inc. | 12/8/2009
12:00 PM
| Warrior in Transition Barracks, Ft. Benning, GA-We are prime contractors bidding this project and are seeking subcontractors/suppliers in the construction industry interested in quoting on work and/or materials. Est construction cost is $25-$100 million. |
| B.L. Harbert International, LLC | 12/8/2009
2:00 PM
| BL Harbert is accepting bids on the Design/Build Warriors in Transition Barracks @ Ft Benning, GA. The project consists of a 120,500 sf barracks & sitework. We wish to solicit participation from all qualified small & minority businesses. |
| SCW Contracting Corp. | 12/8/2009
2:00 PM
| ARRA PROJECT-City Big Bear Lake-Lift Station 2/2A Mod. Subs/Vendors-Elect,Struct Steel/Misc Metals,Rebar,Concrete Contrt, Asphalt Pave, Painting/Coatings,Concrete,Asphalt,Pumps/Motors, Pipe/Valves,Lids/Hatches,Odor Remove Syst,Generator Diesel |
| Town of Mint Hill | 12/8/2009
2:00 PM
| ARRA funded Mint Hill Sidewalk Improvements - grading, concrete sidewalk and driveways, erosion & traffic control. Bids received til 2:00 pm 12/08/09 at Town Hall, 7151 Matthews-Mint Hill Rd , Mint Hill, NC 28227. Questions to: B.Fisher 704.342.3007.
|
| City of Jacksonville | 12/8/2009
3:00 PM
| ARRA - Installation and related equipment for RTU units; communication master polling station control panel; individual spread-spectrum wireless Ethernet links and related equipment; install and startup services; and decommission of existing RTUs. |
| Western Summit Constructors, Inc. | 12/9/2009
1:00 PM
| WSCI is soliciting certified SBE/MBE/WBE/SBRA subcontractors/suppliers for the North Wastewater Treatment Plant Upgrade Project in McAllen, TX. This project has ARRA, TWDB, & EPA Funding. |
| Steelhead Constructors, Inc. | 12/11/2009
2:00 PM
| ARRA ~ DBE, WBE & MBE Subcontractors for Construction of Public Restrooms & Placement of Sewage Treatment/Disposal System at the Trinidad Harbor & Seascape Restaurant at Trinidad CA. Items: Electrical, Paving, Furnish Wastewater System & Piping. |
| B.L. Harbert International, LLC | 12/15/2009
2:00 PM
| BL Harbert is accepting bids on the Design/Build Drill Sergeant School Barracks @ Ft Jackson, SC. The project consists of a 136,000 sf barracks & related sitework. We wish to solicit participation from all qualified small & minority businesses. |
| B.L. Harbert International, LLC | 12/15/2009
2:00 PM
| BL Harbert is accepting bids on the Design/Build Basic Training Barracks @ Ft Benning, GA. The project consists of two 65,000 sf barracks & sitework. We wish to solicit participation from all qualified small & minority businesses. |
| EJ MEYER COMPANY | 12/15/2009
2:00 PM
| ARRA - YUCAIPA VALLEY REGIONAL BRINELINE & NON-POTABLE WATER - EJM IS REQUESTING BIDS FROM (BUT NOT LIMITED TO) HDPE PIPE & WATERWORKS SUPPLIERS, JACKING, PAVING, TRUCKING, STRIPING, HDPE FUSION WELDING, CONCRETE STRUCTURES, AGGREGATE & CONCRETE SUPPLIERS |
| Spiess Construction Co., Inc. | 12/17/2009
2:00 PM
| ARRA FUNDED - CITY OF DEL MAR, CA - 21st Street Sewer Pump Station - We are seeking subcontractors/suppliers for the following: Reinforcing Steel, Concrete, Masonry, Misc. Metals, Painting, Electrical, Standby Generator, Pipe & Fittings. |
| London Community Services District | 12/18/2009
2:00 PM
| London Community Services Dist Wastewater Fac. Improv. Proj. is funded by ARRA and is seeking Prime Contractors. The project consists of replacing aeration sys and assoc elec, reshaping and stabilizing earth ponds, installing and adjusting pond piping. |
| Canyon Springs Enterprises | 12/21/2009
2:00 PM
| State funded project under ARRA, DBE & MWBE Bids requested for 24-In Recycled Water Transmission Main Potrero Blvd Pipeline in Beaumont. Requesting bids for Paving, Boring and Jacking, and Pipe Suppliers. |
| M. A. Mortenson Company | 1/4/2010
2:00 PM
| M. A. Mortenson Company is submitting a proposal and requests subcontractor and supplier quotes for all trades from qualified Small Business Firms for W9126G-08-D-0047/48/49 (G-07-R-0121), 0003AIT Complex Barracks/COFPN 72523, FY2010 Ft Leonard Wood, MO |
| HydroGeoLogic, Inc. | 9/30/2010
2:00 PM
| General Notice: HGL seeks subcontract services in connection with ARRA Radiological Study work at the SSFL, Ventura County, CA. Firms are required to have a DUNS No., register in the CCR & register in HGL's Vendor database at http://www.hgl.com/vendors/. |